Hi,
Engineering Record with Change Master(s) is the more flexible alternative to classic ECR/ECO. The Engineering Record for the approval phase and beyond as the leading object, the Change Master(s) for the implementation phase (in the background).
So integration to/of classic ECR/ECO in ERP does not make sense. Should be migrated to above.
Ulf.