For sure i searched for corrections in the OSS.
We have an planing cube, which is initialized with data from an other cube by a planing sequence. Also the planer can make an upload via Excel file to the cube.
After that they are planing in the bex analyzer which is based on the query with the flexible currency Translation at run time.
The user can choose an currency in the variable Screen and the system will translate it.
But with the time-dependent and variable-dependent currency translation the cells are not input ready. So that's what the warning says at the query check and in the application (analyzer).
So far as i know it worked fine on our old sap bw Version (7.02).
File upload and planings sequences work fine and also the currency translation, but the only problem is that the system can't make the cells with translation input-ready without deleting the currency translation.
Thanks for the reply.